PROJECTS
Land Alternatives has provided Feasibility Analyses, Yield Optimization/Value Engineering, and Entitlement Support services for OVER 160 projects including single and multi-family residential, mixed use, office/retail, light industrial, and recreational development in the Triangle and surrounding areas of Chatham, Durham, Franklin, Guilford, Harnett, Johnston, and Lee Counties as well as the Coast and South Carolina.
-
All
-
FEASIBILITY ANALYSIS – RESIDENTIAL
-
FEASIBILITY ANALYSIS – COMMERCIAL
-
YIELD OPTIMIZATION / VALUE ENGINEERING
-
ENTITLEMENT SUPPORT
Edit Content
- Value Engineering for 40 THs and 57 Lots on 28 acres
- Reduced earthwork, walls, and rock excavation for $500K savings
- Sketch Plan for 220 Apartments with Parking Deck and 20,000 SF Ground Floor Retail on 6 acres with 12 Bonus Condos
- Identified staff support with high density with limited retail
- Rezoning/Site Plan and CDs for 102 THs on 8 acres
- Optimized underground SCMs and minimized utility costs
- Sketch Plan for 108 THs and 120 Lots on 55 acres
- Evaluated AHUs and park dedication to allow higher density
- Rezoning/Site Plan and CDs for 156 Lots on 78 acres
- Managed pump station design and sewer capacity analysis
- Rezoning/Master Plan/CDs for 55 THs and 247 Lots on 74 acres
- Contracted with adjacent property owners for additional land to increase density and off-site sewer easement
- Rezoning/Master Plan/CDs for 312 Apartments, 228 THs, and 50,000 SF Commercial on 55 acres with pump station and signal
- Developed rezoning strategy and managed off-site infrastructure
- Increased Yield from 175 to 225 Lots on 45 acres
- Improved amenity and commercial layouts with condos
- Increased Yield from 155 THs to 198 THs on 3 acres
- Reduced cost $13K/Lot with reduced streets, earthwork, and SCM
- Increased Yield from 125 to 150 Lots for portion of 76 acres
- Increased from 388 to 420 Apartments with OHE Encroachment
- Rezoning/Master Plan for 312 Apartments, 81 THs, and 169 Lots on 89 acres with pump station and Amenity Center
- Coordinated 2nd access R/W dedication with adjacent land owner
- Sketch Plan for Grocery with 10,000 SF and 27 Lots on 18.5 acres
- Evaluated ALT with 120,000 SF Commercial and NO residential
- Rezoning/Schematic Design for 400,000 SF Tech Flex on 66 acres
- Coordinated development budgets for site work and buildings
- Sketch Plan for Cluster Subdivision with 167 Lots on 203 acres
- Evaluated 2-mile waterline extension vs Aqua community wells
- Sketch Plan for 68 THs and 20,000 SF Commercial on 22 acres
- Successful with staff to exclude connectivity to the west
- Sketch Plan for 90 Townhomes on 15-acres
- Identified opportunity with adjacent properties to mitigate rezoning concerns
Edit Content
- Sketch Plan for 108 THs and 120 Lots on 55 acres
- Evaluated AHUs and park dedication to allow higher density
- Sketch Plan for Cluster Subdivision with 167 Lots on 203 acres
- Evaluated 2-mile waterline extension vs Aqua community wells
- Sketch Plan for 68 THs and 20,000 SF Commercial on 22 acres
- Successful with staff to exclude connectivity to the west
- Sketch Plan for 90 Townhomes on 15-acres
- Identified opportunity with adjacent properties to mitigate rezoning concerns
Edit Content
- Sketch Plan for 220 Apartments with Parking Deck and 20,000 SF Ground Floor Retail on 6 acres with 12 Bonus Condos
- Identified staff support with high density with limited retail
- Rezoning/Master Plan for 312 Apartments, 81 THs, and 169 Lots on 89 acres with pump station and Amenity Center
- Coordinated 2nd access R/W dedication with adjacent land owner
- Sketch Plan for Grocery with 10,000 SF and 27 Lots on 18.5 acres
- Evaluated ALT with 120,000 SF Commercial and NO residential
- Rezoning/Schematic Design for 400,000 SF Tech Flex on 66 acres
- Coordinated development budgets for site work and buildings
Edit Content
- Value Engineering for 40 THs and 57 Lots on 28 acres
- Reduced earthwork, walls, and rock excavation for $500K savings
- Increased Yield from 175 to 225 Lots on 45 acres
- Improved amenity and commercial layouts with condos
- Increased Yield from 155 THs to 198 THs on 3 acres
- Reduced cost $13K/Lot with reduced streets, earthwork, and SCM
- Increased Yield from 125 to 150 Lots for portion of 76 acres
- Increased from 388 to 420 Apartments with OHE Encroachment
Edit Content
- Rezoning/Site Plan and CDs for 102 THs on 8 acres
- Optimized underground SCMs and minimized utility costs
- Rezoning/Site Plan and CDs for 156 Lots on 78 acres
- Managed pump station design and sewer capacity analysis
- Rezoning/Master Plan/CDs for 55 THs and 247 Lots on 74 acres
- Contracted with adjacent property owners for additional land to increase density and off-site sewer easement
- Rezoning/Master Plan/CDs for 312 Apartments, 228 THs, and 50,000 SF Commercial on 55 acres with pump station and signal
- Developed rezoning strategy and managed off-site infrastructure
-
All
-
FEASIBILITY ANALYSIS – RESIDENTIAL
-
FEASIBILITY ANALYSIS – COMMERCIAL
-
YIELD OPTIMIZATION / VALUE ENGINEERING
-
ENTITLEMENT SUPPORT
Edit Content
- Value Engineering for 40 THs and 57 Lots on 28 acres
- Reduced earthwork, walls, and rock excavation for $500K savings
- Sketch Plan for 220 Apartments with Parking Deck and 20,000 SF Ground Floor Retail on 6 acres with 12 Bonus Condos
- Identified staff support with high density with limited retail
- Rezoning/Site Plan and CDs for 102 THs on 8 acres
- Optimized underground SCMs and minimized utility costs
- Sketch Plan for 108 THs and 120 Lots on 55 acres
- Evaluated AHUs and park dedication to allow higher density
- Rezoning/Site Plan and CDs for 156 Lots on 78 acres
- Managed pump station design and sewer capacity analysis
- Rezoning/Master Plan/CDs for 55 THs and 247 Lots on 74 acres
- Contracted with adjacent property owners for additional land to increase density and off-site sewer easement
- Rezoning/Master Plan/CDs for 312 Apartments, 228 THs, and 50,000 SF Commercial on 55 acres with pump station and signal
- Developed rezoning strategy and managed off-site infrastructure
- Increased Yield from 175 to 225 Lots on 45 acres
- Improved amenity and commercial layouts with condos
- Increased Yield from 155 THs to 198 THs on 3 acres
- Reduced cost $13K/Lot with reduced streets, earthwork, and SCM
- Increased Yield from 125 to 150 Lots for portion of 76 acres
- Increased from 388 to 420 Apartments with OHE Encroachment
- Rezoning/Master Plan for 312 Apartments, 81 THs, and 169 Lots on 89 acres with pump station and Amenity Center
- Coordinated 2nd access R/W dedication with adjacent land owner
- Sketch Plan for Grocery with 10,000 SF and 27 Lots on 18.5 acres
- Evaluated ALT with 120,000 SF Commercial and NO residential
- Rezoning/Schematic Design for 400,000 SF Tech Flex on 66 acres
- Coordinated development budgets for site work and buildings
- Sketch Plan for Cluster Subdivision with 167 Lots on 203 acres
- Evaluated 2-mile waterline extension vs Aqua community wells
- Sketch Plan for 68 THs and 20,000 SF Commercial on 22 acres
- Successful with staff to exclude connectivity to the west
- Sketch Plan for 90 Townhomes on 15-acres
- Identified opportunity with adjacent properties to mitigate rezoning concerns
Edit Content
- Sketch Plan for 108 THs and 120 Lots on 55 acres
- Evaluated AHUs and park dedication to allow higher density
- Sketch Plan for Cluster Subdivision with 167 Lots on 203 acres
- Evaluated 2-mile waterline extension vs Aqua community wells
- Sketch Plan for 68 THs and 20,000 SF Commercial on 22 acres
- Successful with staff to exclude connectivity to the west
- Sketch Plan for 90 Townhomes on 15-acres
- Identified opportunity with adjacent properties to mitigate rezoning concerns
Edit Content
- Sketch Plan for 220 Apartments with Parking Deck and 20,000 SF Ground Floor Retail on 6 acres with 12 Bonus Condos
- Identified staff support with high density with limited retail
- Rezoning/Master Plan for 312 Apartments, 81 THs, and 169 Lots on 89 acres with pump station and Amenity Center
- Coordinated 2nd access R/W dedication with adjacent land owner
- Sketch Plan for Grocery with 10,000 SF and 27 Lots on 18.5 acres
- Evaluated ALT with 120,000 SF Commercial and NO residential
- Rezoning/Schematic Design for 400,000 SF Tech Flex on 66 acres
- Coordinated development budgets for site work and buildings
Edit Content
- Value Engineering for 40 THs and 57 Lots on 28 acres
- Reduced earthwork, walls, and rock excavation for $500K savings
- Increased Yield from 175 to 225 Lots on 45 acres
- Improved amenity and commercial layouts with condos
- Increased Yield from 155 THs to 198 THs on 3 acres
- Reduced cost $13K/Lot with reduced streets, earthwork, and SCM
- Increased Yield from 125 to 150 Lots for portion of 76 acres
- Increased from 388 to 420 Apartments with OHE Encroachment
Edit Content
Click on the Edit Content button to edit/add the content.
Previous Experience
Land Planning & Entitlement Services at Pulte
- Jordan Manors – Apex (Wm. G. Daniels & Associates) – 80 Lots
- Woodbury – Apex (Withers Ravenel) – 400 Lots with Amenity Center
- 540 Townes – Apex (Hugh Gileece & Associates) – 70 THs
- Townes at Bella Casa – Apex (Jones Cnossen) – 40 THs
- Carpenter Square – Cary (Withers Ravenel) - Increased Yield from 90 to 98 THs
- Estates at Yates Pond – Cary (Withers Ravenel) – 40 Lots
- Olive Branch – Durham (Horvath) – 400 Lots with Amenity Center
- Ellis Road Townhomes – Durham (Horvath) - Increased Yield from 184 to 196 THs
- 55 at the Park – Durham (Horvath) - Increased Yield from 156 to 165 THs
- Lakeshore Townes – Durham (Horvath) - Increased Yield from 45 to 50 THs
- Alexander Place – Durham (Timmons) - Increased Yield from 156 to 165 THs
- Page Square – Durham (McAdams) - Increased Yield from 124 to 129 THs
- Parker Station – Fuquay Varina (Spaulding Norris) – 150 THs
- Royal Creek – Fuquay Varina (Timmons) – 100 THs and 100 Lots
- Carolina Gardens – Fuquay Varina (Timmons) - Increased Yield from 783 to 794 Lots with Amenity Center and PS/FM
- Rutherford – Fuquay Varina (Timmons) – 173 Lots with PS/FM
- Stonecreek – Fuquay Varina (Timmons) – 185 Lots with Amenity Center and PS/FM
- Hidden Valley – Fuquay Varina (Timmons) - Increased Yield from 493 to 505 Lots
- Buffaloe Grove – Garner (Thompson) – 77 Lots
- Steeplechase/Valencia – Holly Springs (McAdams) – 93 Lots
- 540 West – Raleigh (McAdams) - Increased Yield from 383 to 409 Lots with Amenity Center and PS/FM
- Regency at Heritage – Wake Forest/Rolesville (Timmons) – 70 Lots
Project Manager at Stewart
- Alston Landing – Cary (M/I Homes)
- Carolina Coach / The Grey – Raleigh (Stanley Martin)
- Wait Avenue – Rolesville (Pulte)
- The Sterling – Raleigh (Grubb Ventures)
- 1412 Old Apex Road – Cary (Singh Development)
- Pearces Landing – Zebulun (Natelli Communities / NVR)
- Devon Square – Wake Forest (JPM South / Lennar)
- Traditions – Wake Forest (JPM South / MI Homes)
- Affordable Multi Family – Wake Forest
- Soccer Field– RTP (RTI)
- Tennis / Pickleball Complex – Raleigh (SWING)
Project Manager at Withers Ravenel
- Kitts Creeks – Morrisville (Preston / MI Homes)
- Sedgefield – Cary (Preston)
- Greenmoor – Apex (Pulte)
- Carolina Arbors (Pulte)
- Collins Grove – Cary (Standard Pacific)
- Lake Castleberry – Apex (Standard Pacific)
- Saddlebrook Ridge – Wake County (Meritage)
- Adrenaline Park – Apex
- Net Sports facility expansion – Morrisville
- PLAY! Sports Complex - Durham
Project Manager at WSP Sells
- Amberly Towne Center – Cary (Pulte)
- Carolina Preserve Phases 4 and 6– Cary (Pulte)
- Harmony – Cary (Pulte)
- Trinity / Veridea – Apex
- Stonehouse Land Bays 3, 8, and 12 – Williamsburg, VA (GS Virginia)
- Laurel Grove Amenity Center (Merit Award)
- Parkside Towne Commons Phase 1 – Cary (Kite Realty)
- Davis Retail – Apex
Project Manager at Kimley Horn
- Shiloh Crossing - Morrisville/Durham (Walmart and Sam’s Club)
- Broadstone Station - Apex (Kite Realty)
- Sheetz - Multiple sites in Cary, Morrisville, Durham, and Raleigh
- The Tribute - Raleigh
- The Learning Experience – Cary
- First Citizens Bank - Cary
- WCPSS Real Estate Support Services – Garner
Testimonials
Mark, Just an FYI and a thank you. Yesterday I heard from Jamie and Ron that Craig was helpful, his design was an improvement and they felt he added to the team. Good job!
Lee Lambert on Legacy Oaks Yield Optimization